Customer: Navel District of Washington, CSI Engineering, PC

Contract Number: N62477-01-C-0034

Contract Value: $ 800,000.00

Period of Performance: 6 months

Description: Provide full time site supervision and executive level management for the Renovation of the Electrical Distribution System at the Andrews Air Force Base ($10 million contract) and Construct the East Side Substation. Contribute to the development of the design and construction documents by assuring code, safety, FAR and military guidelines are adhered to. Provide overall safety compliance planning and training / certification of all contractors and subcontractors. Responsible for Quality Control of all trades and vendors.

Customer: Fowler Flanagan Technology Partners, LLC

Contract Number: FFETC11013

Contract Value: $647,000.00

Period of Performance: 6 Months

Description: Complete renovation of 2 building, 707 and 705 Edgewood Terrace Washington DC. Scope of work to include new 4000 amp service, mechanical, electrical, security, fire protection, and general construction work to facilitate telecommunication, computer room, and other high technology companies. Work included replacing the existing roof with a 3 ply roof system. Exterior work included new main entrance way, sidewalks and other specific landscaping. New surface stripping and sealing ramp and parking deck.

Customer: US Coast Guard Yard Curtis Bay, CSI Engineering, PC

Contract Number: DTCG-83-00-D-3YD008

Contract Value: $429,000.00

Description: Complete renovation of Drydock (base restaurant, bar and general purpose center) building, Scope of work to include complete renovation of existing building, new bar with cabinets, sinks and dishwasher. replacement of galley equipment and prep areas. New mechanical, electrical, plumbing to include new bathrooms, security, fire protection systems, and general construction work to include tile and carpet flooring, new ceiling system, reconfigure room layout, painting and finishing, extensive woodworking, i.e.. crown and chair molding and intricate oak trim detail. Exterior work included new main entrance way, sidewalks and landscaping.

Back to Top

Customer: United States Coast Guard Logistics Center

Job Location: United States Coast Guard Military Facility, Curtis Bay, Maryland

Contract Number: DTCG40-98-B-40002

Contract Value (Total with Options): $6.6 million

Description: Facility Management-responsible for the operation and maintenance of all mechanical equipment for the entire base including HVAC, plumbing, food service equipment, air and steam, and oil and water separators. Services also encompass the operation and maintenance of the sprinkler system, elevators, and water and sewage systems. In addition, WW performs ground maintenance, pest control, snow removal, disposal of refuse including recycled materials, carpentry, and locksmith services. WW Also provides parking space maintenance services such as striping and patching.. Subcontract disciplines include elevator maintenance, chemical treatment, fire protection, electrical testing, pressure vessel testing, pest control, landscaping, waste management.

Back to Top

Customer: Social Security Administration

Job Location: Social Security Administration-Metro West Facility, 300 N. Greene Street, Baltimore, MD

Contract Number: 0600-02-60065

Contract Value (Total with Options): $6.6 million

Description:WW services includes custodial, snow removal, and pest control. WW is responsible for total building equipment operation including installation, repair and maintenance of all HVAC, electrical and plumbing equipment including boilers, chillers, pumps, air handlers, cooling towers and dehumidification equipment. Testing of all high voltage substations, motor control centers, transfer switches, transformers and panels.

Customer: Social Security Administration

Job Location: Social Security Administration-Metro West Facility, 300 N. Greene Street, Baltimore, MD

Contract Number: 0600-97-31730

Contract Value (Total with Options): $7 million

Description: Facility Management-includes custodial, snow removal, and pest control. WW is responsible for total building equipment operation including installation, repair and maintenance of all HVAC, electrical and plumbing equipment including boilers, chillers, pumps, air handlers, cooling towers and dehumidification equipment. Testing of all high voltage substations, motor control centers, transfer switches, transformers and panels.

Customer: The General Services Administration, Region 11

Job Location: White Oak Federal Research Center, 10901 New Hampshire Avenue, Silver Spring, MD

Contract Number: GS-11P-97-MJC-0007

Contract Value (Total with Options): $5.2 million

Description: Facility Management-includes custodial, snow removal, and pest control. WW is responsible for total building equipment operation including installation, repair and maintenance of all HVAC, electrical and plumbing equipment including boilers, chillers, pumps, air handlers, cooling towers and dehumidification equipment. Testing of all high voltage substations, motor control centers, transfer switches, transformers and panels.